Casa Linda Buying Guide & Models
Build or buy resale. Here’s how it works.
Build or Buy Resale?
There’s no right answer — only the path that fits you best.
Build From the Ground Up
- Choose your lot and position your home intentionally
- Select finishes, colors, and design details
- Move into brand-new construction with warranties
- Plan for a 6–7 month timeline
Move Into What Already Exists
- You’ll get straightforward guidance on pricing, timelines, risks, and trade-offs — even when the right move is to wait or walk away.You want immediate occupancy
- You prefer mature landscaping and established surroundings
- You want to see the exact finished product before buying
From Lot to Keys
- Begin with the villa model that fits how you want to live
- Walk the available lots and select the one that feels right
- Secure your chosen lot with a $25,000 reservation deposit
- Review how the home will sit on your lot (site placement plan)
- Confirm any layout adjustments or finish selections
- Receive your finalized quote based on your selections
- Sign your construction contract (35% deposit)
- Detailed construction plans are prepared
- Your builder is assigned and construction begins
- Receive progress updates through three defined build phases
- Estimated completion: approximately 7 months
Timeline & Protection
- Air conditioning
- Pool equipment (pump and filtration system)
- Landscaping
- Defined construction phases with progress updates
What Comes Standard
- Typical build time: 7 months
- Fastest builds: around 5 months
- $50/day penalty if construction exceeds 7 months
Warranty Coverage
- 15-year roof warranty
- 5-year structural warranty
- 5-year pool finish warranty
- Manufacturer warranties on AC and pool equipment
Appliances and furnishings are selected separately
For those ready to move now, resale homes offer a different option
Welcome to Your New Life Under the Palm Trees
Availability and pricing change, so it’s best to confirm details before planning a visit.
Build or Buy Resale?
There’s no right answer — only the path that fits you best.
Build From the Ground Up
- Choose your lot and position your home intentionally
- Select finishes, colors, and design details
- Move into brand-new construction with warranties
- Plan for a 6–7 month timeline
Move Into What Already Exists
- You want immediate occupancy
- You prefer mature landscaping and established surroundings
- You want to see the exact finished product before buying
Build or Buy Resale?
There’s no right answer — only the path that fits you best.
Build From the Ground Up
- Choose your lot and position your home intentionally
- Select finishes, colors, and design details
- Move into brand-new construction with warranties
- Plan for a 6–7 month timeline
Move Into What Already Exists
- You want immediate occupancy
- You prefer mature landscaping and established surroundings
- You want to see the exact finished product before buying
Build or Buy Resale?
There’s no right answer — only the path that fits you best.
Build From the Ground Up
- Choose your lot and position your home intentionally
- Select finishes, colors, and design details
- Move into brand-new construction with warranties
- Plan for a 6–7 month timeline
Move Into What Already Exists
- You want immediate occupancy
- You prefer mature landscaping and established surroundings
- You want to see the exact finished product before buying
From Lot to Keys
- Begin with the villa model that fits how you want to live
- Walk the available lots and select the one that feels right
- Secure your chosen lot with a $25,000 reservation deposit
- Review how the home will sit on your lot (site placement plan)
- Confirm any layout adjustments or finish selections
- Receive your finalized quote based on your selections
- Sign your construction contract (35% deposit)
- Detailed construction plans are prepared
- Your builder is assigned and construction begins
- Receive progress updates through three defined build phases
- Estimated completion: approximately 7 months
Timeline & Protection
- Air conditioning
- Pool equipment (pump and filtration system)
- Landscaping
- Defined construction phases with progress updates
What Comes Standard
- Typical build time: 7 months
- Fastest builds: around 5 months
- $50/day penalty if construction exceeds 7 months
Warranty Coverage
- 15-year roof warranty
- 5-year structural warranty
- 5-year pool finish warranty
- Manufacturer warranties on AC and pool equipment
Appliances and furnishings are selected separately
